欧美精品一区二区三区蜜桃视频_欧美交换配乱吟粗大视频_国产综合av一区二区三区_国产免费视频观看ai_国产女主播一区二区_伊人亚洲精品

首頁 產(chǎn)品展示>John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法技術(shù)支持,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法費(fèi)用,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法服務(wù)中心,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法價格規(guī)格資料查詢,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法哪里有,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法多少錢,John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法附近聯(lián)系電話,寧波日昕動力科技有限公司
產(chǎn)品咨詢

詳細(xì)描述

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)搖臂總成的安裝方法

1. Install push rods in same location from which removed.NOTE: Valve stem tips are specially hardened; wear capsare not required.

IMPORTANT: Relieve tension on rocker arm adjustingscrew to avoid damaging rocker armshaft during installation.

2. Position rocker arm assembly on engine.

IMPORTANT: Oil supply hole in rocker arm shaftmust be positioned at the flywheel endof engine and facing downward whenrocker shaft is installed.

3. Lubricate all rocker arms with engine oil and makesure they move freely. Tighten rocker arm supportstuds in a criss-cross sequence to specifications.

Specification

Rocker Arm Support Studs—Torque ............................................................................. 60 N•m (44 lb-ft)

4. Adjust valve clearance. (See CHECK AND ADJUSTVALVE CLEARANCE earlier in this group.)

檢查和調(diào)整氣門間隙

IMPORTANT: Valve clearance MUST BE checked andadjusted with engine COLD.

1. Remove rocker arm cover and crankcase ventilatortube.

IMPORTANT: Visually inspect contact surfaces ofvalve tips, bridges and rocker arm wearpads. Check all parts for excessivewear, breakage, or cracks. Replaceparts that show visible damage.Rocker arms that exhibit excessivevalve clearance should be inspectedmore thoroughly to identify damagedparts.

Replace valves, seats, springs andretainers in pairs per cylinder if founddamaged. Also replace bridge if any ofthese parts are replaced.

2. Remove plastic plugs or cover plate from enginetiming/rotation hole (A) and timing pin hole (B).

NOTE: Some engines are equipped with flywheelhousings which do not allow use of an engineflywheel rotation tool. These engines with straightnose crankshafts may be rotated from front noseof engine, using JDG966 Crankshaft Front/RearRotation Adapter.

3. Using JDE83 or JDE81-1 Flywheel Turning Tool, rotateengine flywheel in running direction (clockwise viewedfrom front) until No. 1 cylinder is at TDC compressionstroke. Insert JDG1571 or JDE81-4 Timing Pin inflywheel.

If No. 1 cylinder rocker arms are loose, the engine is at

No. 1 TDC compression.

If No. 1 cylinder rocker arms are not loose, rotateengine one full revolution (360°) to No. 1 TDCcompression.

4. With engine lock-pinned at TDC of No. 1 piston’scompression stroke, check valve clearance to followingspecifications. (Use sequence for 4-cylinder or

6-cylinder engines as outlined on next page.)

Specification

Intake Valve Clearance Checking(Rocker Arm-to-Bridge) (Engine

Cold)—Clearance ................................ 0.31—0.38 mm (0.012—0.015 in.)Exhaust Valve ClearanceChecking (Rocker Arm-to-Bridge)

(Engine Cold)—Clearance................... 0.41—0.48 mm (0.016—0.019 in.)

5. If valves need adjusting, use the appropriate valveclearance adjustment procedure on the next page andadjust to specifications below. Loosen the jam nut (A)on rocker arm adjusting screw. Turn adjusting screw until feeler gauge slips with a slight drag. Hold the adjusting screw from turning with screwdriver and tighten jam nut to specifications. Recheck clearance again after tightening jam nut. Readjust clearance as necessary.

Specification

Intake Valve ClearanceAdjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.36 mm (0.014 in.)

Exhaust Valve Clearance

Adjustment (RockerArm-to-Bridge) (Engine Cold)—

Clearance ................................................................... 0.46 mm (0.018 in.)

Rocker Arm Adjusting Screw Jam

Nut—Torque .................................................................... 27 N•m (20 lb-ft)

6. Install rocker arm cover and crankcase ventilator tube.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)4缸發(fā)動機(jī)的氣門調(diào)整方法

NOTE: Firing order is 1-3-4-2.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1 and 3 exhaust valvesand No. 1 and 2 intake valves.

3. Turn crankshaft 360°. Lock No. 4 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2 and 4 exhaust valvesand No. 3 and 4 intake valves.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)6缸發(fā)動機(jī)的氣門調(diào)整方法

6-Cylinder Engine:

NOTE: Firing order is 1-5-3-6-2-4.

1. Using JDG1571 or JDE81-4 Timing Pin, lock No. 1piston at TDC compression stroke (B).

2. Adjust valve clearance on No. 1, 3 and 5 exhaustvalves and No. 1, 2, and 4 intake valves.

3. Turn crankshaft 360°. Lock No. 6 piston at TDCcompression stroke (C).

4. Adjust valve clearance on No. 2, 4 and 6 exhaustvalves and No. 3, 5, and 6 intake valves.

John Deere約翰迪爾強(qiáng)鹿柴油發(fā)動機(jī)氣門行程的測量方法

IMPORTANT: For a more accurate measurement,measure valve lift at 0.00 mm (0.00 in.)rocker arm-to-valve tip clearance andwith engine COLD.

NOTE: Measuring valve lift provides an indication of wearon camshaft lobes and camshaft followers or pushrods.

1. Remove rocker arm cover.

2. Using JDE81-1 or JDE83 Flywheel Turning Tool andJDG1571 or JDE81-4 Timing Pin inserted in flywheel,lock No. 1 piston at TDC compression stroke.

3. Set rocker arm-to-valve tip clearance to 0.00 mm (0.00in.) for:

· No. 1 and 3 exhaust and No. 1 and 2 intake valveson 4-cylinder engines.

· No. 1, 3, and 5 exhaust and No. 1, 2, and 4 intakevalves on 6-cylinder engines.

4. Place dial indicator tip on top of valve bridge. Preloadindicator tip and set dial at 0.0 mm (0.0 in.).

5. Remove timing pin from flywheel and manually rotateengine one full revolution (360°) in running directionusing appropriate flywheel turning tool.

6. Observe dial indicator reading as valve is moved to fullopen. Record maximum reading and comparewithspecifications given below.

Specification

Intake Valves—Lift 9.03—9.43 mm(0.356—0.371 in.)

Wear Limit .................................................................. 8.70 mm (0.343 in.)Exhaust Valves—Lift 9.32—9.72 mm(0.367—0.383 in.)

Wear Limit .................................................................. 9.00 mm (0.354 in.)

7. Follow same procedure for all remaining valves andrecord readings.

If valve lift on all valves is within specifications, adjustvalve lash to specified clearance. (See CHECK ANDADJUST VALVE CLEARANCE earlier in this group.)If valve lift on one or more valves is not withinspecification, remove and inspect entire valve train andcamshaft.

8. Rotate engine one full revolution (360°). Lock engineat:

· TDC No. 4 compression stroke for 4-cylinderengines.

· TDC No. 6 compression stroke for 6-cylinderengines.

9. Set rocker arm-to-valve tip clearance to 0.0 mm (0.0in.) for:

· No. 2 and 4 exhaust and No. 3 and 4 intake valveson 4-cylinder engines.

· No. 2, 4, and 6 exhaust and No. 3, 5, and 6 intakevalves on 6-cylinder engines.

10. Repeat steps 4—7.

免費(fèi)熱線
400-100-8969???15088860848
機(jī)組銷售
0574-26871589? 15267810868
配件銷售
0574-26886646? 15706865167
維修熱線
0574-26871569  18658287286
手機(jī)端
微信公眾號
在線客服
主站蜘蛛池模板: GOGO全球人体高清大胆亚洲AV | 凹凸视频精品一区二区 | 无码国内精品久久人 | 亚洲精品一区二区三天美 | 成人h动漫精品一区二区 | 中国少妇videosex性高清 | 成年肉动漫在线观看无码中文 | 欧美成人免费全部观看天天性色 | 国产精品久久久久久无毒偷食禁果 | 免费久| 99久久精品国产一区二区成人 | 天海翼一区二区三区四区在线观看 | av制服丝袜诱惑天堂 | 久久精品999 | 99精品视频免费热播在线观看 | 日韩美女被操在线视频网站 | 99爱精品| 久热av中文字幕 | 欧美一级久久久久久久大片 | 一级视频网址 | 亚洲国产精品VA在线观看黑人 | 不卡一区二区在线 | 无毒a网| 国产护士在线观看免费 | 国产一区二区三区久久久 | 青青草成人影视 | 色婷婷精品久久二区二区6 国产成人综合久久二区 | 成人性做爰 | 福利视频在线看 | 久久人人看 | 日本中文字幕视频在线 | 国产一区二区三区内射高清 | 一级免费观看视频 | 久久国产成人精品 | 一区二区三区四区日韩 | 日韩亚洲欧美中文字幕 | 婷婷一区二区三区 | 国产一区二区三区播放 | a亚洲 | 丰满熟妇人妻无码区 | 亚洲精选av|